Maintenance contract
2024 Hydraulic Calculation for 10 Transformers & Generator Rooms.
2024 Refilling & install FM200 Cylinders about 668Kg for Control Towers Menya Centers.
2024 Refilling & Maintaining (44) Dry powder & CO2 Cylinders.
2023 Refilling & Maintaining (36) Dry powder & CO2 Cylinders.
2019 Firefighting System in New Cairo Warehouse includes
Also Supply & install CO2 system, UL/FM obtained for powder room including
Network of mechanical pipes, a network of electrical pipes, and all the equipment fully + connected to fire alarm panel of wires and pipes.
2019 Matic System in Menya & Samalout Warehouse includes
Responsible for the monthly rental of Ambulance truck for three sites.
2023 – 2024 Supplying EHS materials including